.

Hydraulic Piling Frame System

JZB240 pile driver machine Walking Piling Frame for pile foundation worksJZB240 walking piling frame,Website:, jointly developed by beijing construction machinery comprehensive research institute and zhejiang zhenzhong construction machinery co.,ltd, is a new generation large-scale walking piling frame. The product features innovative design, rational structure, advanced technology, superior performance and stable and reliable application. It can be  applied to a variety of foundation construction, especially to meet the soil mixing wall method. It is the ideal and efficient equipment for the foundation construction of highways, bridges, ports, docks, subway stations and high-rise building.It has the following features1.stable and efficient piling frame system2.various power head, jackrod and drilling tool3.comfortable cab, convenient and simple operating system for single person4.convenient installation and transportation5.provide inductive load angle monitor and deep mixing pile monitor, which are conductive to conduct operation and construction managementJZB240Height of mast39.52mMast supporting mode3-point supporting typeMast inclinationForward12°Backward 5°Travel modeWalking typeLateral Travel speed2.9/4.8m/minLengthways Travel speed1.5/2.9m/minOverall dimensions in operation15.35m×9.6m×42.25mMax. Extraction Force710 kNMain Winch pull(1st layer)91.5 kNRope diameter21.5mmDrum capacity550mWinding speed0~26 m/minAuxiliary winch pull(1st layer)72 kNRope diameter20mmDrum capacity250mWinding speed0~32 m/minTotal Weight138TPackaging & ShippingDelivery it without package and some parts should be packaged in wooden case.And it’s better to delivery it in bulk ship.JZB240 pile driver machine Walking Piling Frame works with power headJZB240 pile driver machine Walking Piling Frame works with dual power headJZB240 pile driver machine Walking Piling Frame works with power head in Wenzhou


在线联系供应商

至: Zhejiang Zhenzhong Construction Machinery Co., Ltd
Your E-mail:
消息正文:


Send to other suppliers

Other supplier products

The drill of ZLD series is a special construction equipment working on SMW(Soil Mixing Wall) . Its exploited by our corpration associated with Beij...
JZB240 pile driver machine Walking Piling Frame for pile foundation worksJZB240 walking piling frame,Website:, jointly developed by beijing constru...
The series CFG driller is suitable for CFG pile. It has many advantages; low noise,Website:, without contamination, no vibration when pore-forming,...
TYD series barrel-type hydraulic pile hammer is the latest environmental-friendly foundation construction device developed by our company.Which is ...
The EP series vibratory hammer with adjustable eccentric moment is jointly developed by Beijing Construction Machinery Comprehensive Research Insti...
供应产品

Same products

6 Axis MIG Welding Robot For Carbon Steel
6 Axis MIG Welding Robot For Carbon Steel 卖方: 凯博锐(北京)国际贸易有限公司 6 axis MIG welding robot for carbon steelThis model has high quality and good price. We focus on ...
1800 Mm Arm Length Mig Welding Robot
1800 Mm Arm Length Mig Welding Robot 卖方: 凯博锐(北京)国际贸易有限公司 1800mm arm length MIG welding robot We supply 1800mm arm length MIG welding robot. The robot is o...
1650 Mm Arm Length Mig Welding Robot
1650 Mm Arm Length Mig Welding Robot 卖方: 凯博锐(北京)国际贸易有限公司 1650mm arm length MIG welding robotWe supply 1650mm arm length MIG welding robot. This model is t...
1440 Mm Arm Length Mig Welding Robot
1440 Mm Arm Length Mig Welding Robot 卖方: 凯博锐(北京)国际贸易有限公司 1440mm arm length MIG welding robot This model is our popular model. it is widely used in China. ...
6 Axis MIG Welding Robot For Stainless Steel
6 Axis MIG Welding Robot For Stainless Steel 卖方: 凯博锐(北京)国际贸易有限公司 6 axis MIG welding robot for stainless steel We produce welding robot from 2015,Website:, now we ...