.

Incised sewage pump

Incised sewage pump

WQAS/QWAS(hereinafter referred to as the electric pump below),consist of water pump,seal and motor.

Service conditions:

Discharge ofFactory sewage and commerce sewage;Urban sewage drainage system;Residential sewage drainage station;Civil airdefense system drainage station;Sewage discharge of hospital and hotel;Municipal engineering,construction sites;Assistant equipment for exploration and mining;Rural biogas tank,farmland irrigation.

Product instruction:

WQAS/QWAS(hereinafter referred to as the electric pump below),consist of water pump,seal and motor. The motor is inthe upper part of the electric pump,sharing the phase and three-phase asynchronous motors.Double-end mechanical seal is adopted between water pump and the motor,and “O”shape oil-resistant rubber sealing ring is used for static seal at each fixed stop seal.This series electric pumps are characterized by compact structure,large flow,high efficiency,easy to use,etc.The key part of mechanical seal is made of hard alloy and high-quality silicon carbide,whichhas good characteristicsof anti-corrosion,anti-leakage,durability,etc.

ZhonglanSewage Pumpcharacteristics:

Adoptingadvanced technology,strong sewage drainage capacity,no blocking,can effectively passsolid particles with a diameter of φ30~φ80mm

The tearing mechanism can tear and cut off the fibrous material ,and then discharge it smoothly,no need filter on the pump

The design is reasonable,thepower ofmatching motor is small,the energy saving effect is remarkable.

Adopting the latest material for the mechanical seal can makethe pump run safelyand continuously for more than 8000 hours.

The structure is compact,easyto move,easy to install,whichcan reduce project costs,eliminatethe need to build a pump house.

Remarks:

Before installation and use,pls carefully check whether the outside of the pump is intact,whetherthere is loose connection,oil leakage,and whether the cable is scratched. And pls carefully check the nameplate description of flow,water head range,voltage,etc,in order to use correctly.

Measurethe cold insulation resistance of the electric pump by tramegger and the value should be bigger than 50ΜΩ. If below 50ΜΩ,it can be used till it is qualified after being dehumidified.

Electric pump should be equipped with corresponding switch,and reliable grounding<the double green phase is grounding line>

If the cable attached to the pump is not long enough,the added cable must be 1 times diameter of original pump cable,and the connection is tight.T he cable connection should be minimized and not be submerged in water.

Check if the startup is running properly(idled no more than 10 seconds), if the steering is correct(the pump cover indicates the direction),if three-phase submersible sewage pumphas wrong steering,switching any two main line can correct it.

If you want to know more related products, please click here.



在线联系供应商

至: Tianjin Zhonglan Pump Co., Ltd.
Your E-mail:
消息正文:


Send to other suppliers

Other supplier products

Submersible Sewage Pump
Submersible Sewage Pump Submersible Sewage Pump Sewage pumps are used more and more widely. From the original simply used to transport water to be able to transport a vari...
Hot water submersible pump
Hot water submersible pump Hot water submersible pump It is suitable for hot water well,hot spring,farmland irrigation,garden watering,fountain landscape,rainwater recycling ...
Buoy Sewage Pump
Buoy Sewage Pump Buoy Sewage Pump WQF Buoy sewage pump, the Buoy pump is a replacement product from the traditional extension group, the motor driving the pump is d...
Pitshaft Axial- flow Pump
Pitshaft Axial- flow Pump Pitshaft Axial- flow Pump Summary of submersible of Working principle, installation method, trouble shooting and maintenance Product introduction S...
Coupling axial-flow pump
Coupling axial-flow pump Coupling axial-flow pump It is mainly applied to the re-construction of the pump station,flood control and drainage,urban flood control pump stati...
供应产品

Same products

Yoyik offer Thrust disk ALD320-20X2 for power station
Yoyik offer Thrust disk ALD320-20X2 for power station 卖方: DONGFANG YOYIK (DEYANG) ENGNIEERING CO; LTD "Yoyik offer Thrust disk ALD320-20X2 for power stationMain: hydraulic machinery and components, h...
China offer Aperture gland ALD320-20X2 for Electric Company
China offer Aperture gland ALD320-20X2 for Electric Company 卖方: DONGFANG YOYIK (DEYANG) ENGNIEERING CO; LTD "China offer Aperture gland ALD320-20X2 for Electric CompanyDongfang Yoyik perennial supply spare...
Yoyik offer Throttling ring DLD320-20X2 for power generation
Yoyik offer Throttling ring DLD320-20X2 for power generation 卖方: DONGFANG YOYIK (DEYANG) ENGNIEERING CO; LTD "Yoyik offer Throttling ring DLD320-20X2 for power generationDongfang Yoyik has been focused on m...
China Supplier Aperture gland DLD320-20X2 for steam turbine
China Supplier Aperture gland DLD320-20X2 for steam turbine 卖方: DONGFANG YOYIK (DEYANG) ENGNIEERING CO; LTD "China Supplier Aperture gland DLD320-20X2 for steam turbineDeyang YOYIK have power plant profess...
Fluidic Connections
Fluidic Connections 卖方: Nanjing Runze Fluid Control Equipment Co.,Ltd Fluidic Connections Fluidic Connections were manufactured from molds and injection machines by a...