Hydro-turbine Units for
This project consists of six hydropower stations, and our company is responsible to provide hydro-turbine products, including Pelton turbine runner, Francis turbine runner, Kaplan turbine runner, distributors, guide vanes, spiral case, inlet pipes, elbow pipes, main shafts, runner chamber, nozzle pipes, other accessories, etc. The detailed information is listed below:
|
Plant No. |
Renovation Requirements |
Turbine Type |
Turbine Output |
Remarks |
|
9_SHPP Sveta Petka_ Cultural Relics |
Repair 3 sets of existing units, upgrade governor and relevant turbine equipment. Horizontal Francis turbine units with double-runner structure and exposed groove now become the cultural relics to be protected, and its appearance could not be changed. |
HLGT021-W2J-82 |
282 KW |
It is designed in an integral way by foreign company. There will be a lot of complicities, limits and design difficulties for the repair and renovation of such power station projects which shall be the historical and cultural relics of their countries. |
|
10_SHPP Sievo |
Two sets of new horizontal Kaplan S-type turbines (S-type tubular turbine with rotating blade) will be assembled in the new plant |
GZGT009-WZ-150 |
760 KW |
Adopt CFD design technology for optimization; new unit is manufactured. |
|
11_SHPP Temac Cultural Relics |
Three horizontal Francis units (one big unit and two small units) in the original plant shall be renovated. |
Small Unit HLGT305-WJ-50 |
236 KW |
There will be a lot of complicities, limits and design difficulties for the repair and renovation of such power station projects which shall be the historical and cultural relics of their countries. |
|
Big Unit HLGT309-WJ-74 |
455 KW |
|||
|
12_SHPP Sokolovica |
Three original units in the plant will be renovated. Replace one set of vertical Francis turbine with exposed groove with vertical Kaplan Z-type turbine; replace the original two vertical blade-rotating turbines with new ones (both water head flow and runner diameter increased). The new Kaplan Z-type turbine will be assembled with the original concrete inlet part and draft tube based on the given operation parameters. The new Kaplan turbine shall be designed in a way to match the shape and dimension of the original concrete spiral case and draft tube. So large-scale demolition will not be required. |
Small Unit GZGT025-WZ-106 |
615 KW |
The hydraulic design is made by foreign company. The unit type is very special, and the runner diameter is as small as 1060MM. So it is difficult for the design of turbine with rotating blades. |
|
Big Unit ZZK160-LH-175 |
2153 KW |
The hydraulic design is made by foreign company. It has to match with the shape and dimension of original concrete spiral case and draft tube. The large-scale demolition is not required, so there will be a lot of limits and design difficulties. |
||
|
14_SHPP Vučje Cultural Relics |
Install a set of new Pelton turbine. Three original turbines (one big unit and two small units) were repaired twenty years ago, and now the existing turbines have low efficiency. The big unit is operating in a low efficiency, while the two small units have the problems in their nozzle orifice and needle valves, so their operation efficiency is very low. The existing turbines need to be repaired (due to grease-leakage and painting failure, etc.). The visible parts of the big unit operate occasionally. These units are planned to operate for tourism purpose. These units now become the cultural relics, and in order to maintain their original appearance, these turbines are not allowed to make significant changes, and the turbine types and forms shall not be changed. A new set of vertical 6-nozzle Pelton turbine is designed and manufactured as per modern standards, and shall be installed in the auxiliary plant. After the new unit is put into operation, the original three old units were shut down for cultural protection and tourism. |
CJGT003-L-78/6×7.5 |
1356 KW |
The unit is 780mm in diameter, with 6 nozzles. The unit adopts the exposed structure largely, which is very special. The turbine must support the whole generator and must operate in a stable way, so it is very difficult for the strength and structural design, while at the same time, it is required to consider the convenience of assembly, disassembly and maintenance of unit. |
|
15_SHPP Jelašnica Cultural Relics |
2 sets of horizontal Pelton turbines are renovated. The project has become the cultural relics. So in order to keep the original appearance of the equipment, the turbine is not allowed to make significant changes, its appearance not allowed to be replaced. |
CJGT003-W-70.8/2×5.3 |
230 KW |
There will be a lot of complicities, limits and design difficulties for the repair and renovation of such power station projects which shall be the historical and cultural relics of their countries. |
在线联系供应商
Other supplier products
| Francis turbine | Francis turbine Francis turbines are built in a compact structure, with high efficiency, and can be applied to a wide range of water heads. This f... | |
| Forged Entire CNC Machined Francis Runner | Forged Entire CNC Machined Francis Runner Forging could considerably improve metal’s organizational structure and mechanical property. For... | |
| Double-structure Francis Turbine Runner for Project in Papua New Guinea | On January 15, 2020, Project Owner Mr. Francis and Project Supervisor Mr. Bjarne Borrsen, visited Shenyang Getai Hydropower Equipment Co., Ltd. for... | |
| Kaplan & Tubular Turbine | Kaplan & Tubular Turbine Kaplan Turbine is suitable for medium & low water head and large flow power plants. With same water head, the Kap... | |
| Francis Turbine Generator | Francis Turbine Generator Francis turbines are built in a compact structure, with high efficiency, and can be applied to a wide range of water hea... |
Same products
| 单工位静电打孔机 | 卖方: 武汉冠油科技有限公司 | 单工位静电打孔机是一款专业应用于国内外香烟接装纸生产厂家和卷烟生产行业的接装纸静电打孔机,具有独立知识产权。相比激光打孔机,静电打孔在实现高透气度的同时,能保持稳定性,避免激光打孔时孔径过大导致... | |
| CNC-YF-8208/8212 2-Axis Small Compression Spring Coiling Machine | 卖方: Zhejiang Yinfeng Automation Technology Co., Ltd. | The 2-axis Spring Coiling Machine offers a reliable and efficient solution for spring manufacturi... | |
| Repair Tool for Mobile Screen Separation | 卖方: 深圳市维客修科技有限公司 | 描述 YCS 多功能拆框机,适用于手机平面/曲面 LCD 屏幕分离和后盖拆卸。YCS 拆框机预装通用手机摄像头镜头孔,可快速分离屏幕,同时保护手机摄像头。 特点: 1. 多用途:YCS 多功能... | |
| 1800w strong power professional 45mm air cylinder hex tool holder demolition hammer | 卖方: ZheJiang Oliver Gear Manufacturing Co., ltd. | The 1800W Strong Power Professional 45mm Air Cylinder HEX Tool Holder Demolition Hammer is a powe... | |
| GREENMAX EPP Granulator | 卖方: INTCO Recycling | Production automation, manpower saving. Perfect adaption to multiple materials processing system.... |