Lamp Start, Run-up Time And LED Flicker Test
Lamp Start,Website:, Run-up time and LED Flicker Test Dated 14th December, 2012, the EU officially released the (EU) NO 1194/2012rules.Compared withwhich posted by theEuropean Commission Regulation (EC) NO 244/2009 Regulations dated 18th March, 2009, the new rules have complete mandatory and eco-design requirements. Start and Run-up time as the two indicators functional requirements in the industry has been more emphasis by manufacturers.To meet EU ErP requirements, IEC60969 Self-ballasted Lamps for General Lighting Services Performance requirements and Energy Star about Lamp Start, Run-up Time and Flicker Test. LISUN developed ErP test system, the LSRF-1 system hardware include following LISUN insruments: PH3000, IS-1.5MA, SLS-50W and LSP-500VAC; the software include the Lamp Start, Run-up Time and Lamp Flick Test. The Lamp Start, Run-up time and LED Flicker Test System can combined with LISUN LPCE-1 or LPCE-2 to test CFL or LED lamps.
Other supplier products
|
|
|
IEC 60695-2-20 Hot Wire Ignition Test Apparatus Hot wire ignition tester is according to the standard requirement of IEC60695-2-20 and GB4943,Websi... |
|
|
|
IEC 60068-2-1 IEC60068-2-2 Constant High Low Temperature and Humidity Cycling Chamber Constant High Low Temperature and Humidity Cycling Chamber is... |
|
|
|
IEC 61000-4-12 Ring Wave Generator With 0~6KV Voltage Ring Wave Generator is the test equipment in conformity to IEC (the International Electro tec... |
|
|
|
High Precision Rotation Luminaire LED Goniophotometer LSG-1800B/LSG-1700B/LSG-1600B High Precision Rotation Luminaire LED Goniophotometer is high p... |
|
|
|
IEC 61000-4-11 Voltage Dips and Interruptions Generator The Voltage Dips and Interruptions Generator is specially designed according to the charact... |
供应产品
Same products