ANSI/UL94, IEC 60950-1, IEC 695-2-2 Horizontal Vertical Flame Test Equipment

ANSIUL94,Website:, IEC 60950-1, IEC 695-2-2 Horizontal Vertical Flame Test Equipment Horizontal Vertical Flame Test Equipment meets the requirements of ANSI/UL94, IEC60950-1, IEC695-2-2 Standard. It is used to test the appliances and plastic materials parts of electrical equipment for the horizontal, vertical flammability test. The product tank shell is irony spray, and configured a transparent viewing window, the digital meter shows the burning time, afterflame time, afterglow time, this device has beautiful appearance, is easy to use and has reliable performance. • Burning Time: 0~999.9S(Adjustable), After flame Time: 0~999.9S (Adjustable), After-blanch Time: 0~999.9S(Adjustable)
• Burning Angle: 0°, 20°, 45° and optional, Flame Height: 20mm~175mm(Adjustable)
• Gas Flow: 0.03~0.3ml/Min, Gas Pressure: 0~16Kpa pressure gauge±200mm spout
• Burning Lamp: Internal tube diameter: 9.5±0.3mm, Length: 100mm±10mm
• Time Device: It can be accurate to 0.5S, Linear Measure: In millimeter
• Pressure Gauge: It can measure 200mm water, taking 5mm as the increment.
• Flow Meter: The maximum measurement accuracy is ±2%
• Position Adjustment: Sample clamp bracket can be up and down, left and right controlled, combustion seat can be adjusted back and forth, the stroke adjustment is greater than 300 mm.
Other supplier products
|
|
|
IEC 60529,Website:, IEC 60598, IEC 60335 and IEC 60034-5 Water Ingress Testing Equipment for IPX1 to IPX8 JL-X Water Ingress Testing Equipment is a... |
|
|
|
kHz~30MHz EMI Test Equipment KH3961 is an automatic EMI Test Equipment. It is a main test system for EMI (Electro Magnetic Interference) testing. T... |
|
|
|
Luminous Flux,Website:, CCT, CRI LED Light Tester System LPCE-3 is a Luminous Flux, CCT, CRI LED Light Tester System. It is suitable for photometri... |
|
|
|
AC/DC Withstand Voltage Test With Voltage 0~5KV(AC/DC) AC/DC Withstand Voltage Test
• Output voltage: 0-5kV(AC/DC);
• Cutoff current range: AC... |
|
|
|
Lamp Start,Website:, Run-up time and LED Flicker Test Dated 14th December, 2012, the EU officially released the (EU) NO 1194/2012rules.Compared wit... |
供应产品
Same products