.

Mould Component

Mould Component

Mould Componentsare also a part of the mould. GM-TECH not only produces precision moulds but also provides customers with high-precision, low-cost mould parts. For example mould cores, inserts, sliders, lifter, wear plates, ejector pins, etc. Usually, processing accuracy can be controlled within + /-0.015mm. Delivery time is 2-3 weeks, DHL or FedEx will take about 3 days for shipping.

All the steel and tolerances of the parts are processed according to the drawings of the customers. In order to ensure the quality of parts processing of different types of injection moulding, we will provide customers with dimensional measurement report, hardness measurement report, material proof.

We also use new plastic mold technologyto do DLC surface treatment to guarantee the life of the parts.

Mould Component Features

All the steel and tolerances of the parts are processed according to the drawings of the customers. In order to ensure the quality of parts processing, we will provide customers with dimensional measurement report, hardness measurement report, material proof.

We also use new technology to do DLC surface treatment to guarantee the life of the parts.

Mould Components are also a part of the mould. GM-TECH, a reliable injection plastic molded partsmanufacturer, not only produces precision moulds but also provides customers with high-precision, low-cost mould parts. For example: mould cores, inserts, sliders, lifter, wear plates, ejector pins, etc. Usually, processing accuracy can be controlled within + /-0.015mm. Delivery time is 2-3 weeks, DHL or FedEx will take about 3 days for shipping.

All the steel and tolerances of the parts are processed according to the drawings of the customers. In order to ensure the quality of parts processing, we will provide customers with dimensional measurement report, hardness measurement report, material proof.

We also use new technology to do DLC surface treatment to guarantee the life of the parts such as medical device molding parts.

Mould Component FAQs

What is the tolerance of parts?What is the tolerance of parts?

If the customer does not have special requirements, the processing is generally within + / - 0.02mm.

How long is the delivery time for mold part processing?How long is the delivery time for mold part processing?

Specific to see the difficulty of part, generally1-2 weeks.

How many days does it take to send parts to Germany?How many days does it take to send parts to Germany?

The fastest DHL express delivery in Europe usually takes about 3 days to reach each country in Europe, while FedEx in the United States usually takes about 3 days to arrive.


在线联系供应商

至: 格利特模具科技有限公司
Your E-mail:
消息正文:


Send to other suppliers

Other supplier products

Mould Component
Mould Component Mould Componentare also a part of the mould.GM-TECH not only produces precision moulds but also provides customers with high-precision, low-cost mo...
2K Mould
2K Mould 2k injection mouldingis a manufacturing process that refers to molding two materials or colors into one plastic part. This technology combines t...
Automotive Part
Automotive Part As the foundation of the automotive industry, injection molding automotive parts are necessary factors to support the sustainable and healthy devel...
Insert Mould
Insert Mould General precision injection molding has two indicators: one is equipment precision, and the other is mold error. The former is difficult to compare...
Plastic Injection Mould
Plastic Injection Mould As a China injection mould factory, GM-TECH is mainly engaged in the production of high-precision injection mould production plants. And the produc...
供应产品

Same products

Gr400 Pneumatic Conveying Equipment/Pneumatic High Pressure Conveying Equipment
Gr400 Pneumatic Conveying Equipment/Pneumatic High Pressure Conveying Equipment 卖方: Greentech International (Zhangqiu) Co., Ltd Cast Iron Blow Through Airlock Valve Positive Rotary FeederRotary airlocks displace bulk solids f...
Gr300 Pneumatic Conveying Equipment/Air Vacuum Powder Automatic Conveying Equipment
Gr300 Pneumatic Conveying Equipment/Air Vacuum Powder Automatic Conveying Equipment 卖方: Greentech International (Zhangqiu) Co., Ltd Cast Iron Blow Through Airlock Valve Positive Rotary FeederRotary airlocks displace bulk solids f...
Belaz Dump Truck Parts
Belaz Dump Truck Parts 卖方: XINGTAI ME MINING EQUIPMENT CO.,LTD. Belaz Dump Truck Parts Spare Parts-China Manufacturer and Supplier XTME offers a comprehens...
Komatsu Dump Truck Parts
Komatsu Dump Truck Parts 卖方: XINGTAI ME MINING EQUIPMENT CO.,LTD. Komatsu Dump Truck Parts -China Manufacturer and Supplier 100% OEM-Compatible Spare Parts-K...
Dredger Pumps and Parts
Dredger Pumps and Parts 卖方: Shijiazhuang Industrial Pump Factory Co., Ltd. High Durability:Constructed withrobust materialsto withstand abrasive and corrosive environments....