.

Rail shoulder used on railway concrete sleeper

Rail shoulder is cast in the concrete rail ties to fix the elastic rail clips. There are two types of rail shoulders available, the cast-in shoulder and the weld-on shoulder, both of which are used for the fixing of elastic rail clips.

Rail Shoulders (4).jpgRail Shoulders (6).jpg

The casting shoulders as the embedded part of the rail way fastening system are pressed in concrete sleeper and work together with the E clip to fasten the rail. The cast in shoulder is made by casting from iron, such as, GB/T 1348-1988, NF EN 1563(1997), ISO1038, DIN 1693, JIS G5502 (2001), KS D 4302, GOST 7293(1985) or BS EN 1563(1997).

Rail Shoulders (1).jpgRail Shoulders (3).jpgRail Shoulders (2).jpg

Application
UIC54
UIC60
115RE, ,50kg rail, 60kg rail,
BS80lbs, BS100lbs, ect.
Name
QT500-7
QT450-10
QT400-15
Standard
GB 1348-88
GB 1348-88
GB 1348-89
Chemical
composition(%)
C:3.60-3.80
C:3.40-3.90
C:3.50-3.60
C:3.60-3.80
Mn:0.2-0.5
Mn:≤0.5
Si:2.50-2.90
Si:2.70-3.00
Si:3.0-3.2
P:≤0.08
P:≤0.07
P:≤0.07
S:≤0.025
S:≤0.03
S:≤0.02
Tensile Strength
≥500 Mpa
≥450 Mpa
≥400 Mpa
Yield Strength
≥320 Mpa
≥310 Mpa
≥250 Mpa
Elongation(%)
≥7
≥10
≥15
Hardness
170~230HB
160~210HB
130~180HB
Metallographic
organization
ferrite & pearlite
graphite & ferrite & pearlite
ferrite

Rail Shoulders (7).jpgRail Shoulders (5).jpg

Rail Shoulder Applications:

The weld on shoulder fastening makes the fabrication of rail retaining units on both steel sleepers and steel base plates possible when the E style of elastic rail clips are used for the fasting of the rail.
Even though the rail cast in shoulder are usually pressed in the concrete sleeper, it also can be welded on to longer length steel sleeper sections or bearers for use in the fabrication of switch and crossing layouts where vertical rail geometry is employed.
The welding ability of rail shoulders in particular position which is dictated by layout design makes rail shoulders much useful and cost effective.
Rail shoulder accessories used for specific rail sections should be adopted according to design criteria in order to achieve the correct elastic clip toe loading . And certain rail shoulders with milled weld area faces are provided to achieve a better weld integrity.

Rail Shoulder (4).jpgRail Shoulder (5).jpgRail Shoulder (6).jpg

Production Processs

Ruika adheres to the business mode of "Development by quality and survival by reputation". A one-stop system of production, sales and maintenance has been formed. For customers who purchase rail shoulder from our factory, if quality problems occur within half a year, our factory implements the "three guarantees" of products! Resolutely think that customer service is the center! Be a real person and do things steadfastly!
rail shoulder (1).jpg
Our company is a manufacturer of induction furnaces made of gray iron, ductile iron and alloy! Advanced technology, using lost foam technology. Strict technical requirements and advanced automatic inspection equipment ensure the quality of Rail Shoulder.

Professional equipment processes the shape of Rail Shoulder to make the shape of the product smoother, more delicate and beautiful!

Packaging & Shipping

Packing

Our Services

As an ISO 9001 certified company,Ruika has built the intensive quality control networks, established strict rules and inspection standards.We only assigned professional and experienced staffs during the whole procedure as the key resource of the quality control.

As one of the first recommend premium suppliers on Alibaba, Ruika is always committed to providing you with a complete set of railway accessory systems to fit your needs: Steel Rail, Rail Clip, Fishplate(Joint Bar), Baseplate, Rubber Pad, Rubber Crossing Plates, Screw Fasteners, Rail Clamps, Rail Anchors, Turnout, Wagons, Locomotive and Rail Maintenance Machines, etc.

Factory VisitingOur People

Certifications

Certifications

FAQ

Q: Are you trading company or manufacturer ?
A: We are a factory.

Q: How long is your delivery time?
A: Generally within 25-30 days for a 20ft container after the prepayment received.

Q: What is your terms of payment ?
A: 30% of the payment in advance , the balance before shippment via T/T.

Q: Will that be possible for us to receive pieces of samples for approval?
A: Sure. The samples can be supplied for free but the freight counts on you.

Q: What's the packing way?
A: Bundled in steel strips with iron/wood pallets.

Q: How long will it be the quotation valid?
A: The validity is 15 days in general, but also depends on the quantity and special conditions. It will be shown in every quotation.

Q: What is MOQ?
A: 20’’ container in general, depending on whether enough stocks available for small quantity; customized products accepted.

Q: Do you have any certifications regarding rail tie plates?
A: We have passed the certification of CRCC in China and ISO9001:2008 overseas. Before shipment, Certificate of Quality can be supplied. We also accept Third Party Inspection from clients, with free samples to supply.

Contact us

If you have any questions, pls feel free to contact us as below:


Web:

Email:



在线联系供应商

至: MAANSHAN LEOMON ENERGY-SAVING TECHNOLOGY CO. LTD
Your E-mail:
消息正文:


Send to other suppliers

Other supplier products

Rail fishplate splice bar used for railroad fastening
Rail fishplate splice bar used for railroad fastening Rail joints, also named splice bar, fishplates or rail joint bar, is a metal bar that is welded into two rails in order to join them together. It...
Rail Screw Spike for Wooden or Concrete Sleeper railway fastener
Rail Screw Spike for Wooden or Concrete Sleeper railway fastener Rail screw spike, also called sleeper screw, rail screw or lag bolt, is a medium or large metal screw used to fasten arail tie platesor rail. Rai...
High quality  high tensile galvanized rail fish bolt
High quality high tensile galvanized rail fish bolt Fishtail Bolts (Fish Bolts) are mostly used in rail joints (Railway Fishplates) for fixing purposes. Sometimes, hexagon bolts can be used instead. ...
Square Head Lag Track Bolt
Square Head Lag Track Bolt Track bolts, also called fang bolts or rail anchor bolts, are used to fix steel rails and rail chairs torail tie plates, or to fastenrail jointst...
Railway Wheels Forged  Casting Steel Train Wheel Rail Wheel
Railway Wheels Forged Casting Steel Train Wheel Rail Wheel Widely used in logistics, freight wagon, muck car, and other railway transport. It can be designed and manufactured according to user’s req...
供应产品

Same products

Warehouse-type Transport Semi-trailer
Warehouse-type Transport Semi-trailer 卖方: Shijiazhuang Jintongda Special Purpose Vehicle Co.,Ltd. warehouse-type transport semi-trailer
Ford King Axle
Ford King Axle 卖方: Shijiazhuang Jintongda Special Purpose Vehicle Co.,Ltd. Ford King Axle 1. The shaft head is forged with alloy material and processed by CNC lathe after ...
Van Transport Semi - Trailer
Van Transport Semi - Trailer 卖方: Shijiazhuang Jintongda Special Purpose Vehicle Co.,Ltd. Van transport semi - trailer 1. Van-type transport semi-trailers are mainly used to transport var...
Container Semi-trailer
Container Semi-trailer 卖方: Shijiazhuang Jintongda Special Purpose Vehicle Co.,Ltd. Container Semi-trailer Competitive Advantage: 1) Our company produces flat semitrailer divided i...
Back Flip Semi-trailer
Back Flip Semi-trailer 卖方: Shijiazhuang Jintongda Special Purpose Vehicle Co.,Ltd. Back Flip Semi-trailer 1. The front-top and back-turning self-unloading fence semi-trailer is sui...