Lamp Start, Run-up Time and Flicker Test System
The system is designed according to BASIC, Energy Star V2.1, IEC-Pst, CA CEC, ASSIST, CIE SVM and IEEE Std 1789, it used to test the Flicker test, Start and Run-up time (work with LSP-500VAC) for the LED lamp, CFL and all other luminaires
Other supplier products
|
|
Drip Box |
According to IEC60884,IEC60529,VDE0620 and EN50075 to test IPX1 and IPX2. 800mm*800mm*45mm(H) |
|
|
High and Low Temperature Humidity Chamber |
It is according to IEC60068-2-1 and IEC60068-2-2. The temperature range is -40~150℃ and humidity is 30%~98%RH with programmable function. The worki... |
|
|
LM-79 Moving Detector Type C Goniophotometer |
LSG-6000 Moving DetectorGoniophotometer(Mirror Type C) was manufactured by LISUN completely meetsLM-79-19,IES LM-80-08,COMMISSION DELEGATED REGULAT... |
|
|
Electrostatic Discharge Simulator |
According to IEC61000-4-2, EN61000-4-2 and GB/T17626.2. Output voltage is 0~20KV. Contact and Air Discharges test mode. The big LCD screen can be t... |
|
|
Lamp Start, Run-up Time and Flicker Test System |
The system is designed according to BASIC, Energy Star V2.1, IEC-Pst, CA CEC, ASSIST, CIE SVM and IEEE Std 1789, it used to test the Flicker test, ... |
All supplier products
Same products