GlobeCore INEY transformer oil refrigeration unit

GlobeCore is proud to offer INEY vacuum and refrigeration drying cold trap for processing of solid insulation in transformers in the range of 110 – 1150 kV. The unit is designed to be used for transformer installation, servicing and repairs.
Three types of units are manufactured, which are different in terms of components, operation modes and specificaions. All types are equally good are their jobs.
Type one: single with double stage refrigerator capable of temperature to -70oC.
Type two: a composite unit with a vacuum pump: one module is a double stage refrigerator as described above, the other module is equipped with a backing pump and a liquid cooling and heating system.
Type three: a composite unit, one module is a double stage refrigerator, the other module is equipped with three backing pumps and a vacuum pump.
Select the best option for the requirement of your facility.
Refrigeration section
1 – compressor 1; 2 – fan 1; 3 – compressor 2; 4 – fan 2; 5 – solenoid valve; 6 – solenoid valve 1; 7 – solenoid valve2; 8 – compressor crankcase heating 1; 9 – compressor crankcase heating 2; 10 – evaporator; 11 – double channel pressure relay 1; 12 – double channel pressure relay 2; 13 – single channel pressure relay ; 14 – pressure and vacuum gague “Input pressure” 1; 15 – pressure and vacuum gague “Output pressure” 1; 16 – pressure and vacuum gague “Input pressure” 2; 17 – pressure and vacuum gague “Output pressure” 2; 18 – condensate drain valve.
The unit operates in the following modes:
«COLD ACCUMULATION»
The surface of the evaporator decreases gradually to -700С.
«FREEZING»
After reaching the pre-defined temperautre of-700С, the system automatically switches to cyclic operation, where some components are stopped and started as required.
«EVAPORATOR DEFROST»
As moisture accumulates in the evaporator, it must be removed by defrosting. The defrosting process takes approximately 30 minutes.
When the evaporator reduces the temperature in the cold trap to -70oC, the difference of vapor pressure in the trap and over the solid insulation of the transformer (e.g. saturated water vapor pressure at +20oC is 2337 Pa, and only 18 Pa at -40oC), drives the water vapor from the transofrmer tank into the cold trap, where it freezes in the evaporator. The duration of drying depens on how much moisture is present in the transformer, inside and outside temperatures, as well as residual pressure in the transformer tank. The unit can operate continuously for 20 days.
A sight glass in the insulated cold trap allows to observe the process visually. A condensate drain valve in the bottom of the trap facilitates removal of condensation after defrosting. The unit is capable of trapping 7.5 kg of moisture in 24 hours approximately.
(INEY system in late stages of assembly)
This product is accordingly certified with documents regarding the system’s quality and standards, just as any other product by GlobeCore.
The factory is located in Poltava, Ukraine, ul. Sadovskogo, 8.
The manufacturing time of the unit is 45 to 60 business days depending on selected options.
GlobeCore provides effective solutions to the equipment needs of your facility. Contact our sales manager for assitance in selecting the necessary options, sale terms and conditions, as well as commissioning and contract conclusion. After that the ordered unit is manufactured. This stage is the longest, and in this time we welcome you to visit our facility and witness the process of manufacturing of your product, as well as other products. When production is complete, the product is tested for acceptance and is shipped to the client.
We are always open to cooperation.


在线联系供应商

至: GlobeCore
Your E-mail:
消息正文:


Send to other suppliers

Other supplier products

GlobeCore Vacuum Systems BV series
GlobeCore Vacuum Systems BV series Vacuum Systems BV series Application Vacuum Pump Units BV series are designed for puling vacuum on the transformer tank. Vacuum fill ensures that ...
Globe Core Transformer Oil Purification Plant CMM (UVM) 4 with High Vacuum
Globe Core Transformer Oil Purification Plant CMM (UVM) 4 with High Vacuum Removes Water from 100 ppm down to 10 ppm and from 50 ppm to 5 ppm in a single pass (ASTM method D-1533) Reduces Gas content from fully saturated w...
GlobeCore UVB -1 productivity of 1 m3 per hour
GlobeCore UVB -1 productivity of 1 m3 per hour UVB-1 bitumen unit is designed for production both anionic and cationic bitumen emulsions, which are used in road construction as follows: base coa...
GlobeCore UVB -1 productivity of 2 m3 per hour
GlobeCore UVB -1 productivity of 2 m3 per hour UVB-1 bitumen unit is designed for production both anionic and cationic bitumen emulsions, which are used in road construction as follows: - base ...
GlobeCore Transformer Oil Regeneration Plant
GlobeCore Transformer Oil Regeneration Plant The Plant’s design includes Fuller’s Earth reactivation in situ for continuous reuse of Fuller’s Earth. Fuller’s Earth regeneration facility will a...
供应产品

Same products

UV Detector
UV Detector 卖方: 淮安市鑫盛制药设备有限公司 A DAC column,or Dynamic Axial Compression column,is a self-packingcolumn used for separation in l...
YCS 手机屏幕后盖拆卸
YCS 手机屏幕后盖拆卸 卖方: 深圳维客修科技有限公司 描述 YCS 多功能拆框机,适用于手机平面/曲面 LCD 屏幕分离和后盖拆卸。YCS 拆框机预装通用手机摄像头镜头孔,可快速分离屏幕,同时保护手机摄像头。 特点: 1. 多用途:YCS 多功能...
Bio-Pro全自动层析系统
Bio-Pro全自动层析系统 卖方: 淮安市鑫盛制药设备有限公司 iBio®系列全自动层析系统根据GMP和ASME BPE相关要求进行设计,集成了系统流路模块和自动化控制模块,可自动并连续进行平衡、上样、洗脱、自动收集、在线清洗等工艺过程,实现工艺流程...
Mcc450 手动层析柱
Mcc450 手动层析柱 卖方: 淮安市鑫盛制药设备有限公司 产品概述 MCC450手动层析柱是根据cGMP法规为生物制品中试放大而设计的,分配结构与自动柱ACC保持一致,可以实现柱效的线性放大。MCC手动层析柱采用了肖特精加工玻璃设计,无论在产品品质还...
Mongoose MD2/3 Shale Shaker Screen
Mongoose MD2/3 Shale Shaker Screen 卖方: Tangshan AngXin Technology Co.,Ltd Mongoose MD2/3 shale shaker screen fits for Swaco mongoose MD series shale shakers. The material ...