.

Sand and Dust Test Chamber for Automotive Connectors

Operating Conditions:

Ambient temperature: 5°C~+28°C (average temperature within 24 hours ≤28°C); Ambient humidity: ≤85%

Technical Parameters:

1. Nominal spacing of the metal mesh is 50μm, and the nominal spacing between wires is 70μm

2. Airflow velocity: ≤2m/s (standard type) or ≥2m/s (specify when placing an order) 3. Continuous or periodic dust - blowing can be freely selected, or time can be set 4. Talcum powder dosage: 2kg - 4kg/㎡ 5. Dust for testing: Dry talcum powder, portland cement, soot, etc. 6. Vibration time: adjustable from 0 to 9999 minutes (M represents minutes) 7. Fan cycle time: 0 to 9999 minutes (M represents minutes) 8. Standard configuration: The sand and dust testing equipment is equipped with 2 specimen racks and 2kg of talcum powder 9. Power requirements: AC380(±10%)V/50HZ, three - phase five - wire

Product Applications:

This equipment is suitable for dust - proof and dust - resistance tests of various automotive components, including vehicle lamps, instruments, electrical dust - proof sleeves, steering systems, door locks, etc., to verify the sealing quality of products.

Structural Features:

1. Material of the chamber outer shell: High - quality carbon steel plate, with phosphating and electrostatic powder spraying on the surface, and hairline treatment for SUS304 stainless - steel strips; 2. Inner liner material: Imported SUS stainless - steel polished plate; 3. Chamber door: Tempered glass door, facilitating the observation of the tested samples inside the test chamber; 4. High - quality fixed PU casters are used at the bottom; 5. There is a dust - replacement device at the bottom of the test chamber

System Structure:

1. Control system: The sand and dust testing equipment is controlled by a programmable logic PLC controller to manage the time and sequence of the dust - blowing, vibration and vacuum systems

2. Actuating components: "Schneider" AC contactors, switches, buttons; "Fuji" intermediate relays; "Panasonic" dust - proof sockets

3. Dust pre - heating system: Stainless - steel mica heating jacket, with stable and safe heat; it has timer - controlled heating; Vacuum system: Equipped with a pressure gauge, air filter, pressure - regulating triple unit and connecting pipes (the vacuum pump is provided separately, please specify when placing an order)

4. Power socket for test specimens: Dust - proof socket, AC220V 16A

5. Circulating fan: Low - noise motor with a multi - blade centrifugal impeller

6. Protection system: With protection functions against electric leakage, short - circuit, over - temperature, motor overheating, over - current / power - off memory protection for the controller


在线联系供应商

至: Standard International Group (HK) Limited
Your E-mail:
消息正文:


Send to other suppliers

Other supplier products

Car seat static strength tester-QINSUN
Car seat static strength tester-QINSUN Applicable standards: GB 11550-2009"Car seat headrest strength requirements and test methods" : This standard specifies the static strength test r...
High-Power Lamp tube (1500W~12000W)
High-Power Lamp tube (1500W~12000W) Applicable Standards High-power lamp tubes adhere to global safety and performance benchmarks, including: IEC 60598-1(Luminaires – Genera...
 Veslic Multi-Functional Material Tester for Advanced Quality Control-QINSUN
Veslic Multi-Functional Material Tester for Advanced Quality Control-QINSUN Standard ISO 13934-1(Tensile Properties of Fabrics) ASTM D624(Tear Strength of Rubber and Elastomers) AATCC 135(Dimensional Changes in Textiles ...
Automotive Wires Liquid Resistance Tester
Automotive Wires Liquid Resistance Tester Test Standards: Requirements for liquid resistance tests of automotive wires in ISO 6722. SAE J1128. QC/T 730. and JASOD611 Main Parameters: T...
Thermal Insulation Tester
Thermal Insulation Tester Meet the standard JIS L1018.34.1A method/Knitted fabrics test methods, heat retention (constant temperature method) JIS L1096 8.28.1A method/Gene...
供应产品

Same products

Briefly describe the importance, core functionality and how to implement a hospital clock system solution
Briefly describe the importance, core functionality and how to implement a hospital clock system solution 卖方: California Triangle In the healthcare industry, precise time synchronization is critical. Every second can be a matte...
Sand and Dust Test Chamber for Automotive Connectors
Sand and Dust Test Chamber for Automotive Connectors 卖方: Standard International Group (HK) Limited Operating Conditions: Ambient temperature: 5°C~+28°C (average temperature within 24 hour...
Automotive Connector SO₂/H₂S Corrosion Test Chamber
Automotive Connector SO₂/H₂S Corrosion Test Chamber 卖方: Standard International Group (HK) Limited Standards: GB/T 10587-89. GB/T 2423.9-93: Chinese national standards for sulfur dioxide corrosio...
Automotive Connectors Salt Spray Tester
Automotive Connectors Salt Spray Tester 卖方: Standard International Group (HK) Limited Applicable Standards: Neutral Salt Spray (NSS) Tests: GB/T2423.17. ISO 3768/3769/3770. ASTM B117...
Air - tightness Testing Device for Automotive Connectors
Air - tightness Testing Device for Automotive Connectors 卖方: Standard International Group (HK) Limited Main Functions: 1. Provide stable positive and negative pressures for testing the air - tightnes...